how manybricks
Home/Rendering/Calculator

Rendering Calculator

Bags required, weight and volume (estimate)

Inputs

Mix ratio: 1:4 (cement:sand) + plasticiser

Results

Enter your wall area then click Calculate.

NAIBC / IRC codes

References & Sources

Standards Cited
  • ASTM C926 โ€” Standard Specification for Application of Portland Cement-Based Plaster
    Defines external render/stucco systems, coat thicknesses, and application methods
  • ASTM C1063 โ€” Standard Specification for Installation of Lathing and Furring to Receive Interior and Exterior Portland Cement-Based Plaster
    Specification for substrate preparation and lath installation for stucco/render
Formulas Used
  • Render volume: volumeM3 = wallArea x (thickness x numberOfCoats / 1000)
    Source: ASTM C926
  • Render weight: weightKg = volumeM3 x density x (1 + wastage/100)
    Source: ASTM C926 โ€” Densities: sand-cement/lime/polymer ~2000 kg/m3, insulating ~800 kg/m3
  • Bags required: bagsRequired = ceil((wallArea x totalThicknessMm/10 / coveragePerBag) x (1 + wastage/100))
    Source: ASTM C926 โ€” Coverage per 25kg bag at 10mm: sand-cement 1.2 m2, lime 1.5 m2, polymer 1.3 m2, insulating 0.8 m2
Key Assumptions
  • Render densities: sand-cement/lime/polymer approximately 2000 kg/m3, insulating approximately 800 kg/m3 โ€” ASTM C926
  • Recommended mix ratios: sand-cement 1:4 + plasticiser, lime 1:1:6, polymer and insulating are pre-mixed โ€” ASTM C926 / ASTM C1063
  • Coverage per 25kg bag at 10mm thickness: sand-cement 1.2 m2, lime 1.5 m2, polymer 1.3 m2, insulating 0.8 m2 โ€” ASTM C926
  • Typical wastage allowance of 10-15% for render โ€” Industry standard practice