About This Calculator
This calculator estimates the amount of gravel or crushed stone needed for driveways, paths, sub-bases, and landscaping projects. It accounts for compaction when using sub-base materials.
Recommended Depths
| Application | Depth |
|---|---|
| Decorative / garden paths | 30-50 mm |
| Driveway surface | 50-75 mm |
| Sub-base (pedestrian) | 100-150 mm |
| Sub-base (vehicular) | 150-225 mm |
Tips
- β’ Sub-base materials compact by 20-25%, so order more than the finished volume
- β’ Use a weed membrane underneath decorative gravel
- β’ Edging helps contain gravel and maintain neat boundaries
- β’ Add 5-10% wastage for uneven ground or spillage
Ready to Calculate?
Enter your area and depth to get volume, weight, and delivery requirements.
Open CalculatorRelated Calculators
FLFlorida Building Code
References & Sources
Standards Cited
- ASTM D2940 β Standard Specification for Graded Aggregate Material for Bases or Subbases
Defines gradation and compaction requirements for crushed stone base materials - AASHTO M 147 β Standard Specification for Materials for Aggregate and Soil-Aggregate Subbases, Bases, and Surface Courses
Classification of aggregate base materials (Class 5, etc.)
Formulas Used
- Compacted target volume:
compactedVolume = area Γ depth
Source: Basic geometry - Loose order volume:
looseVolume = compactedVolume Γ compactionFactor
Source: ASTM D2940 β A factor of 1.25 means 1.25m3 loose compacts to 1.0m3, a 20% reduction from loose volume - Weight from basis-matched volume:
weight = densityBasisVolume Γ density Γ (1 + wastage/100)
Source: Material-specific densities β Use compacted target volume for a compacted density and loose volume for a loose density. Compaction changes bulk volume, not mass. - Delivery units:
units = ceil(orderMass / bagMass) or ceil(looseOrderVolume / loadVolume)
Source: Supplier delivery-unit basis
Key Assumptions
- Quoted bulk densities: crushed stone ~1750 kg/m3, pea gravel ~1600 kg/m3; each material records whether its density is loose or compacted β ASTM D2940 / industry standard
- Sub-base loose-volume factor 1.25 (1.25m3 loose produces 1.0m3 compacted, a 20% reduction) β AASHTO compaction standards